收录期刊

    LI Xiaohong, ZHANG Mingyuan, LIANG Yong, ZHANG Qi, WANG Gang, WANG Quanxi, ZHAO Liping, REN Minglei, LIU He, NING Yawei, TANG Rong, QI Chenyu. The functional planning for the construction of the Guanting Reservoir Matrix Management PlatformJ. China Flood & Drought Management, 2026, 36(9): 52-58. DOI: 10.16867/j.issn.1673-9264.2025344
    Citation: LI Xiaohong, ZHANG Mingyuan, LIANG Yong, ZHANG Qi, WANG Gang, WANG Quanxi, ZHAO Liping, REN Minglei, LIU He, NING Yawei, TANG Rong, QI Chenyu. The functional planning for the construction of the Guanting Reservoir Matrix Management PlatformJ. China Flood & Drought Management, 2026, 36(9): 52-58. DOI: 10.16867/j.issn.1673-9264.2025344

    The functional planning for the construction of the Guanting Reservoir Matrix Management Platform

    • Constructing a modern reservoir operation and management matrix is a core measure for implementing the requirements of high-quality water conservancy development in the new stage and achieving refined management along with safe and efficient reservoir operation. Based on the existing work of Guanting Reservoir, this paper proposes the overall framework for the construction of its matrix management platform, with the "Four Preventions" in flood control as the main focus.The platform integrates information infrastructure and digital twin technology. This paper systematically elaborates on the design concepts for each functional unit, with particular emphasis on innovative practices in enhancing forecasting and warning capabilities, as well as achieving flood pre-simulation and dispatch decision support. The platform is expected to improve the precision and modernization of the Guanting Reservoir's operation and management, providing important references for other reservoirs across the country in advancing their own matrix construction.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return